Rhinophalt Testimonials
Duro Basic, Transport for London
Even without the financial benefit, the environmental advantages [of Rhinopatch and Rhinophalt] are so much greater over the traditional methods that it will be recommended for implementation.
Duro Basic, Asset Modeller, Transport for London
Andy Ward, Enterprise
The ASI method of infra-red patching has the unique benefit of the Rhinophalt rejuvenator applied to the whole of the heated area, ensuring that the maximum amount of heated surface is protected from further deterioration for the length of the life of the existing surface.
Andy Ward, Innovations Development Manager, Enterprise Plc
Steve Thompson, Herefordshire County Council
In the long term these treatments have been extremely successful. 7 years ago we repaired a stretch of road with Rhinopatch and then preserved it with Rhinophalt. We have not had to do any repairs on that piece of road since and we would normally have expected to carry out a number of patch repairs. It was a very, very quick operation that has given us 7 years of life.
Steve Thompson, Assistant Area Manager Central Division, Herefordshire County Council
Jason Russell, London Borough of Merton
We treated the Aberconway Road with Rhinophalt in 2002 when we first heard about it. The treatment was carried out successfully, causing minimal disruption to traffic and no surface defects have appeared since.
Rhinophalt user Jason Russell, Principal Engineer for Road Maintenance at the London Borough of Merton