A505 Royston to Baldock
In October 2007 Rhinophalt was applied to 17,500m2 of heavily trafficked dual carriageway. Although the HRA surface was 8 years old no sign of chip loss was evident. Three months earlier an older section of this road was surface dressed with premium grade as it had deteriorated further than the section in the case study.
A505 Before & After

Please click here to download the full Rhinophalt Case Study PDF.