A35 Dorchester by-pass

Rhinophalt treatment on the busy by-pass was undertaken on 13 - 15 October 2007 with the objective of arresting chip loss. The 17,560m2 area of single carriageway is sited in a rural location. Although the road is 18 years old, defelectograph monitoring indicated over 10 years more structural life.

A35 Before & After
A35 Dorchester

Please click here to download the full Rhinophalt Case Study PDF.