A1 Black Cat Roundabout

This failing six year old SMA was fretting and pulling up in wheel tracks. The Rhinophalt treatment was carried out in October 2007 during the night with TM restrictions. This section of road totalling some 52,200m2 was expected to need replacing in Spring 2008 but will now be preserved.

A1 Black Cat Roundabout Before & After
Black Cat

Please click here to download the full Rhinophalt Case Study PDF.